Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

In TeamForm we recognise people in 2 ways:

  1. Members - Otherwise known as ‘headcount’ which is the physical number of people allocated within the team

  2. FTE - The total available capacity of a person that can be allocated into a team

image-20240220-163201.png

For example:

  • Bob as a person is 1 headcount but he works part-time therefore his available FTE/capacity that can be allocated out is 0.8 therefore creating a difference between the two values

What’s the difference between the two different FTE values shown against a team?

  • eg: In the photo above we see 230.74 FTE / 239.93 FTE

    • 230.74 FTE - This is how much of the available FTE has been allocated into this specific team

    • 239.93 FTE - This is how much available FTE that can be allocated into this specific team

  • No labels